Skip to main content

Exploration no. 27513 from Subsurface document no. 5233 [Folder View]

Exploration no. 27513 is a Geotechnical (depth 10.4 feet) named: HC-1 described in subsurface document no. 5233. The document, a report titled Picnic Point Bridge Replacement was prepared by Hart-Crowser and Associates, Inc. on 03-24-1987 for a Bridge project.