Skip to main content

Anacostia River fringe wetlands restoration project: final report for the five-year monitoring program (2003 through 2007)

Dates

Publication Date

Citation

Anacostia River fringe wetlands restoration project: final report for the five-year monitoring program (2003 through 2007); 2009; Federal Government Series; Krafft, Cairn C.; Hammerschlag, Richard S.; Guntenspergen, Glenn R.

Summary

The 6-hectare (ha) freshwater tidal Anacostia River Fringe Wetlands (Fringe Wetlands) were reconstructed along the mainstem of the Anacostia River in Washington, DC (Photograph 1, Figure 1) during the summer of 2003. The Fringe Wetlands consist of two separate planting cells. Fringe A, located adjacent to Lower Kingman Island, on the west bank of the Anacostia River, occupies 1.6 ha; Fringe B, located on the east bank of the Anacostia River, occupies 4.4 ha. This project is the third in a series of freshwater tidal wetland reconstructions on the Anacostia River designed and implemented by the US Army Corps of Engineers (USACE) Baltimore District and District Department of the Environment (DDOE) on lands managed by the National Park [...]

Contacts

Attached Files

Click on title to download individual files attached to this item.

metadata9178648146005733272.xml
Potential Metadata Source

View
3.37 KB
Thumbnail
Thumbnail

Tags

Categories
Types

Provenance

Data source
Harvester
Harvested on Mon Jul 21 11:24:06 MDT 2014 from MODS XML Service

Additional Information

Identifiers

Type Scheme Key
local-index unknown 70003472
local-pk unknown 70003472

Citation Extension

parts
typePublication Place
valueWashington, D.C.
languageEnglish
citationTypeReport

Item Actions

View Item as ...

Save Item as ...

View Item...