Skip to main content

Survey technical report

Summary

This directory contains a technical report by Sander Geophysics describing data collection and processing in detail. Note: The surveys were conducted from July 15, 2012 - July 25, 2012. The flight line spacing was 200 meters for traverse lines and 2000 meters for control lines. The area was flown along a draped surface with a nominal survey height above ground of 125 meters.

Attached Files

Click on title to download individual files attached to this item.

LouisaVA_Technical_Report.pdf 6.17 MB application/pdf

Communities

  • USGS Data Release Products

Provenance

Data source
Input directly

Item Actions

View Item as ...

Save Item as ...

View Item...