Lone Mountain NRDAR Settlement in the Powell River Watershed
Summary
In October 1996, a coal slurry impoundment associated with a coal processing plant owned by Lone Mountain Processing, Inc., in Lee County, Virginia, failed and released six million gallons of coal slurry into the Powell River watershed. “Blackwater,” a mixture of water, coal fines, clay, and associated contaminants, extended more than 20 miles downstream from the spill site. The Powell River watershed is part of the Upper Tennessee River Basin, which comprises one of the nation’s most biologically diverse aquatic ecosystems (U.S. Fish and Wildlife Service, 2003). The coal slurry spill affected fish, endangered freshwater mussels, other stream organisms, and supporting aquatic habitat, including designated critical habitat for two Federally [...]
Summary
In October 1996, a coal slurry impoundment associated with a coal processing plant owned by Lone Mountain Processing, Inc., in Lee County, Virginia, failed and released six million gallons of coal slurry into the Powell River watershed. “Blackwater,” a mixture of water, coal fines, clay, and associated contaminants, extended more than 20 miles downstream from the spill site. The Powell River watershed is part of the Upper Tennessee River Basin, which comprises one of the nation’s most biologically diverse aquatic ecosystems (U.S. Fish and Wildlife Service, 2003). The coal slurry spill affected fish, endangered freshwater mussels, other stream organisms, and supporting aquatic habitat, including designated critical habitat for two Federally listed fish—the yellowfin madtom (
Noturus flavipinnis) and the slender chub (
Erimystax cahni). A Natural Resource Damage Assessment and Restoration (NRDAR) settlement required that Lone Mountain Processing, Inc., pay $2,450,000 in damages for the natural resource injuries caused by the slurry spill to restore fish, mussels, and the habitats that support them. As part of this settlement, more than 500 acres of riparian land in southwestern Virginia have been preserved in partnership with The Nature Conservancy to protect habitat for aquatic organisms and other species, such as bats and songbirds.
This case study tells the story of five restoration projects in the Upper Tennessee River Basin that were supported by the Lone Mountain NRDAR settlement and the economic activity generated through expenditures on these projects. The highlighted restoration projects include: two mussel and fish propagation and reintroduction projects that are working to replace freshwater mussels and fish species killed during the spill, two instream and riparian restoration projects designed to provide fish and mussel habitat and to provide recreation and education opportunities in Lee County, and one acid mine drainage abatement project designed to improve water quality in the watershed. Figure 1-1 shows a map of the spill site and the five highlighted restoration projects. The U.S. Geological Survey collected data on restoration activities and expenditures to estimate the economic activity supported by these restoration projects.
Background information on the Lone Mountain NRDAR settlement was obtained from Anne Condon, U.S. Fish and Wildlife Service Virginia Field Office, written commun., 2015; and from Lone Mountain NRDAR case documents at
http://www.cerc.usgs.gov/orda_docs/CaseDetails?ID=914.