Section 69_55_1_1 was drilled as a part of Project Number 0095-091-004-B622-B618 in Sussex County, VDOT District Hampton Roads on 19680517 at the intersection of 0095 and Powanty Creek. The section has 9 drill logs. Groundwater data is not included. Lithology data is not included.