Section 69_55_18_1 was drilled as a part of Project Number 0095-091-004-PE101-B620 in Sussex County, VDOT District Hampton Roads on 19690610 at the intersection of 0095 and Rte. 0642. The section has 5 drill logs. Groundwater data is included. Lithology data is not included.