Section 68_51_9_3a was drilled as a part of Project Number 7019-092-101-PE101-B609-B610 in Tazewell County, VDOT District Bristol on 19680901 at the intersection of 0019 and Plum Creek. The section has 4 drill logs. Groundwater data is included. Lithology data is included.