Remarks: Also referred to as Tickaboo Valley Federal No. 6-1. Only minor gas shows and some minor source rocks were detected during drilling. Wireline log analysis indicated low porosity and permeability in these zones and there was also a lack of any oil stain or cut; Elevation: 1340 m; Permit Issue Date: 17 October 1988; Completion Date: 23 December 1988; Status: plugged and abandoned; Logs: Lithologic, Dipmeter, Directional, Borehole Compensated Sonic, Neutron/Gamma Ray/Density, Dual Laterolog/Gamma Ray, Fracture Analysis Sonic Scatter Plot ; Samples: cuttings 18-2377 m