Skip to main content

Assessment of stormwater control measures at the Niagara River Greenway Project, Buffalo, New York

Dates

Start Date
2016-10-01
End Date
2022-09-30

Summary

Background The proposed study will examine any existing data from the monitoring wells, weather station, and flow through the storm sewer system (supplied by Buffalo Sewer Authority) to determine the dynamics of the system during storm events. Further analysis using all available information is needed to fully understand the relationship of events to the implementation of Green Infrastructure stormwater-control measure effectiveness. Questions to be addressed include: How do pipe flows and groundwater levels respond to storms? Can the data be used to quantify water-budget components at the site? To what extent can the effect of the Green Infrastructure in reducing stormwater volumes and peaks be quantified? Based on the current [...]

Child Items (0)

Contacts

Principal Investigator :
Brett A Hayhurst
Co-Investigator :
Valerie E Shao
Funding Agency :
US Environmental Protection Agency (EPA)
CMS Group :
New York Water Science Center

Attached Files

Click on title to download individual files attached to this item.

LK00-GCT3500-Fig1.jpg
“Green Infrastructure Monitoring Site Locations in Buffalo, NY”
thumbnail 516.3 KB image/jpeg
LK00-GCT3500-Fig2.jpg
“Sewer Mains and Combined Sewer Overflow Locations in City of Buffalo”
thumbnail 232.93 KB image/jpeg
LK00-GCT3500-Fig3.jpg
“Manhole Cover and Accompanying NEMA Box Set-Up at E. Niagara Street Location”
thumbnail 188.05 KB image/jpeg
LK00-GCT3500-Fig4.jpg
“ADVM Sensor and Bubbler Set-Up inside Storm Pipe at E. Niagara Street Location”
thumbnail 83.59 KB image/jpeg
Shapefile: Hayhurst_Shao_LK00_GCT3500.zip
Hayhurst_Shao_LK00_GCT3500.dbf 9.96 KB
Hayhurst_Shao_LK00_GCT3500.prj 494 Bytes
Hayhurst_Shao_LK00_GCT3500.shp 1.44 KB
Hayhurst_Shao_LK00_GCT3500.shx 132 Bytes

Project Extension

parts
typeShort Project Description
valueThe USGS will be monitoring storm and combined-sewer flows along the Niagara Street corridor before and after installation of stormwater control measures to fully characterize the performance of the stormwater control measures over a range of hydraulic conditions. These stormwater control measures performance information could be used to design future phases of the proposed stormwater green infrastructures envisioned for the Niagara River Greenway Project (NRGP).
projectStatusActive

Green Infrastructure Monitoring Site Locations in Buffalo, NY
Green Infrastructure Monitoring Site Locations in Buffalo, NY

Map

Spatial Services

ScienceBase WMS

ScienceBase WFS

Communities

  • USGS New York Water Science Center

Tags

Provenance

DEPTH-

Additional Information

Alternate Titles

  • Niagara River Greenway Project

Identifiers

Type Scheme Key
projectId BASIS+ LK00-GCT3500

Shapefile Extension

boundingBox
minY42.91110158304673
minX-78.9007245265159
maxY42.92909730240809
maxX-78.89650397655384
files
nameHayhurst_Shao_LK00_GCT3500.dbf
contentTypeapplication/unknown
pathOnDisk__disk__0d/87/7c/0d877ccd6daec1bb7b698bbc9cee804064fa154d
size10202
dateUploadedTue Nov 22 05:10:16 MST 2016
checksum
value52bef2ed2308c830fd331291961dc44a
typeMD5
nameHayhurst_Shao_LK00_GCT3500.prj
contentTypetext/plain
pathOnDisk__disk__c7/bf/5d/c7bf5da1731183dfbe8f28018a06ed3de54a34ce
size494
dateUploadedTue Nov 22 05:10:16 MST 2016
checksum
value58fc8d6ff647f50c68ce47f1401fdb8b
typeMD5
nameHayhurst_Shao_LK00_GCT3500.shp
contentTypex-gis/x-shapefile
pathOnDisk__disk__09/ae/59/09ae5991384108c201edee3019cd322071570c9e
size1476
dateUploadedTue Nov 22 05:10:16 MST 2016
checksum
value8fe43f09f6b95465e980925695ee9fa3
typeMD5
nameHayhurst_Shao_LK00_GCT3500.shx
contentTypex-gis/x-shapefile
pathOnDisk__disk__c3/6f/7d/c36f7d1499a60f69b8330118ff66302f01587638
size132
dateUploadedTue Nov 22 05:10:16 MST 2016
checksum
value80afa4a2d2bd7c9c29ead1f56b4c3fbf
typeMD5
geometryTypeMultiPolygon
nameHayhurst_Shao_LK00_GCT3500
nativeCrsEPSG:102717

Item Actions

View Item as ...

Save Item as ...

View Item...