Exploration no. 15256 is a Geotechnical (depth 48 feet) named: B-106 described in subsurface document no. 3735. The document, a report titled S Lucille St Bridge Replacement was prepared by Hart-Crowser and Associates, Inc. on 12-03-1979 for a Roadway project.