Exploration no. 20064 is a Geotechnical (depth 19 feet) named: BH-3 described in subsurface document no. 4307. The document, a report titled Metro Park and Ride, Rockery Wall was prepared by Golder and Associates, Inc. on 12-19-1991 for a Retaining wall project.