Exploration no. 21965 is a Test pit (depth 12 feet) named: TP-15 described in subsurface document no. 4550. The document, a report titled Tolt Pipeline No. 2, Phase IV was prepared by Hong West and Associates, Inc. on 07-01-1997 for a Utility project.