Exploration no. 27922 is a Geotechnical (depth 31.8 feet) named: TH-C-1 described in subsurface document no. 5271. The document, a report titled SR-525 Complete Freeway and HOV Lanes was prepared by WA State Dept. of Transportation on 01-01-1996 for a Roadway project.