Exploration no. 28146 is a Geotechnical (depth 4.5 feet) named: PP-2-97 described in subsurface document no. 5293. The document, a report titled SR-525, SR-99 Interchange was prepared by WA State Dept. of Transportation on 11-07-1997 for a Roadway project.