Exploration no. 57743 is a Geotechnical (depth 12.4 feet) named: BR-27 described in subsurface document no. 10224. The document, a report titled SR-5 HOV Lanes, Tukwila to Lucile St was prepared by Shannon and Wilson, Inc. on 04-04-1994 for a Roadway project.