Exploration no. 60124 is a Geotechnical (depth 21.9 feet) named: HB-104 described in subsurface document no. 10924. The document, a report titled California Way SW Landslide was prepared by Shannon and Wilson, Inc. on 07-30-1975 for a Landslide project.