Exploration no. 68491 is a Geotechnical (depth 5.9 feet) named: H-2 described in subsurface document no. 13695. The document, a report titled I-90 E Mercer Interchange, Stage 2 Luminaries was prepared by WA State Dept. of Transportation on 07-16-1986 for a Roadway project.