Exploration no. 122037 is a Geotechnical (depth 105.5 feet) named: B-1 described in subsurface document no. 51199. The document, a report titled Tolt Hill Bridge Replacement was prepared by Lorilla Engineering, Inc. on 12-01-1996 for a Bridge project.