Exploration no. 141457 is a Geotechnical (depth 19 feet) named: B-3 described in subsurface document no. 4362. The document, a report titled Proposed Canyon Park Crossing Development was prepared by Geotech Consultants, Inc. on 08-01-1996 for a Residential project.