Skip to main content

Exploration no. 27513 from Subsurface document no. 5233

Dates

Dataset Reference Date
1983-01-24
Info Date
1983

Summary

Exploration no. 27513 is a Geotechnical (depth 10.4 feet) named: HC-1 described in subsurface document no. 5233. The document, a report titled Picnic Point Bridge Replacement was prepared by Hart-Crowser and Associates, Inc. on 03-24-1987 for a Bridge project.

Attached Files

Material Request Instructions

https://fortress.wa.gov/dnr/geologydata/subsurface_pdfs/5200-5299/005233.pdf
Preview Image

Map

Communities

  • ReSciColl Archive

Tags

Categories
Other

Provenance

Data source
File Processing
File Process

Additional Information

Identifiers

Type Scheme Key
title Parent-4f4e48c5e4b07f02db53f51c Exploration no. 27513 from Subsurface document no. 5233

NGGDPP Item Extension

alternateGeometryThe coordinates are represented in World Geodetic System 1984 (WGS84). Spatial accuracy of exploration is: Less than 20 feet
verticalExtentMax10.4
verticalExtentMin0
verticalExtentUnitsf

Item Actions

View Item as ...

Save Item as ...

View Item...