Exploration no. 54562 is a Boring / probe (depth 49.5 feet) named: 5 described in subsurface document no. 9754. The document, a report titled Double Leaf Trunnion Bascule Bridge was prepared by City of Seattle, Dept. of Engineering on 01-26-1915 for a Bridge project.