Skip to main content
Advanced Search

Filters: Types: ScienceBase Project (X) > Tags: {"type":"Label"} (X)

24 results (54ms)   

View Results as: JSON ATOM CSV
thumbnail
This is a collaborative, two-part project to compile and analyze resource data to support WLCI efforts. Part 1 entails directing data synthesis and assessment activities to ensure that they will inform and support the WLCI LPDTs and Coordination Team in their conservation planning efforts, such as developing conservation priorities and strategies, identifying priority areas for conservation actions, evaluating and ranking conservation projects, and evaluating spatial and ecological relations between proposed habitat projects and WLCI priorities. In FY2014, we helped the Coordination Team complete the WLCI Conservation Action Plan and BLM’s annual report, and we provided maps and other materials to assist with ranking...
thumbnail
Project Synopsis: the Ferris Mountain project area consists of mainly timbered slopes, interspersed with upland areas dominated by sagebrush, grass, and mountain shrub communities. Timber stands within the project unit consist of Douglas fir, subalpine fir, spruce, lodgepole pine, limber pine, and aspen, in addition to scattered locations of Rocky Mountain juniper. Long-term suppression of wildfires has promoted the encroachment of conifers into shrublands, aspen stands, and drainages supporting aspen, waterbirch and willows, to the point where many of these communities are non-functional. Decadence and disease is commonly observed in terms of mistletoe, blister rust, and bleeding rust, and pine beetles have...
thumbnail
Project Synopsis: BLM Kemmerer Field Office (KFO) proposes to construct riparian exclosures within the “Sage” sage-grouse core area as designated by the Wyoming Governor’s Executive Order (EO 2011-5). During late summer, fall and early winter of 2011 the BLM mapped and inventoried approximately 190 reservoirs and 50 springs/seeps in the Ruby Priority Project area. After compiling 2011 data, the BLM identified several springs/seeps as priorities for protection/enhancement. The springs/seeps are repeatedly grazed to the extent that hummocks are forming or have already formed. Once hummocks form or start to form, the immediate threat is a high soil compaction which could result in a lower water table, the spring/seep...
thumbnail
Managing, analyzing, providing, and using data and information resources assembled or generated for the WLCI are essential for supporting WLCI goals. This project addresses those needs by providing online tools for (1) discovering and using existing data and information; (2) cataloging, preserving, and archiving those resources; and (3) making them available to WLCI researchers, decision-makers, and the public. A WLCI Data Catalog (Catalog) hosted by USGS is available at www.wlci.gov. The Catalog includes information about and access to data sets, projects, publications, and Web sites relevant to the WLCI. This Catalog is continuously maintained and enhanced to meet user needs, capitalize on technological innovations,...
thumbnail
Project Synopsis: the goal of this study is to define the potential accumulation of hydrocarbons in surface waters and aquatic habitats of the New Fork River and to establish a baseline of potential toxicological effects on aquatic life.
thumbnail
Partners and stakeholders of the WLCI have expressed the need to access descriptive information and locations of (1) "on-the-ground" habitat conservation projects managed by the WLCI Coordination Team and (2) science projects being conducted by USGS and other science-agency partners. In response to this need, WLCI project information is documented in the Clearinghouse and available on the WLCI Web site (www.wlci.gov). The Clearinghouse provides an interactive map environment enabling users to click on geospatially referenced points, view project information, link to additional resources (including data), and use search and filter capabilities to constrain the information returned. Project information is entered...
thumbnail
A multipartner project as large as the WLCI requires excellent intra- and interagency communication, as well as dissemination of products and other information to those interested in learning about the WLCI, gleaning information for informing and supporting planning and decisions, and tracking project progress. To meet that need, the USGS developed a Web site for the WLCI at www.wlci.gov. This Web site provides information about ongoing activities and facilitates user discovery (search functions) of additional resources, including workshops, publications, reports, newsletters, data, and both habitat conservation and science projects. With aid from the USGS Data and Information Management Team, the WLCI Coordination...
thumbnail
Project Synopsis: improved grazing management over the past decade in the lower Coal Creek drainage has resulted in gradual positive trends in riparian habitat conditions. This project will address degraded habitat conditions not directly related to grazing management and build additional trust and cooperation. The Thomas Fork Habitat Management Plan developed cooperatively by WGFD and BLM in 1979 “to preserve, manage, and enhance BCT habitat” identified sediment contribution from the Coal Creek road as an important issue. In 2010, WGFD hired a consultant to develop conceptual plans to address the large amounts of sediment contributed into the stream at eleven (11) key sites along a two (2) mile stretch of Coal...
thumbnail
This is a multi-year project to repair a diversion structure which is preventing a head-cut from continuing upstream. Objectives: 1) Reduce or halt erosion occurring at the headcut. 2) Halt the headcut progression which may infringe on and destabilize upstream railroad, highway, interstate, and mine PMT. 3) Halt the headcut progression into the upstream channel morphology and riparian regime. Strategies: • Detailed runoff and flow analysis to the headcut location for the associated 830 square mile drainage area. • Selection of the acceptable design event/peak design flow for the structure. • Determination of all permitting requirements, timeframes, and responsibilities. • Evaluation of the native material stability...
thumbnail
Project Synopsis: habitat conditions for both livestock and wildlife are less than desired due, in part, to past management practices on the ranch and inability to better control current cattle grazing location and timing. Plans are to provide water (successful water well drilled in 2011) and fencing for grazing management, habitat improvements on mule deer winter range including invasive plant species (juniper and cheatgrass) control, and riparian improvements in Wood Draw to remove invasive juniper and control noxious weeds including musk thistle and leafy spurge.
thumbnail
Addressing concerns about the types and development of energy and a secure energy future is a high priority for the current United States administration, the Department of the Interior (DOI) in particular. The BLM and other land management agencies within the DOI are charged with balancing energy development with other land uses and values. Decision-making about land uses is often controversial and complex; this necessitates easy access to useful data, literature, and other informative resources that facilitate a better understanding of how energy development affects natural resources, ecosystems, economics, and society. Although there are several valuable on-line resources that provide information about energy...
thumbnail
Strategies: a three-pronged approach will continue to be taken during the next three years, with WLCI funds primarily going toward the first "prong" (much of this in the Greys River drainage), and some funds going toward the second "prong": 1. Prevent the successful establishment of noxious weed species not yet established on National Forest System lands in the Greys River Ranger District. 2. Prevent the successful establishment of new infestations of spotted knapweed, leafy spurge, yellow toadflax, and Dyer’s woad beyond existing perimeters along roads, trails, and adjoining lands, and either eliminate existing patches or reduce the density of noxious weed densities to a point in which a native plant diversity...
thumbnail
Project Synopsis: the strategy for restoring the habitat on Currant Creek is to permanently exclude unauthorized livestock from the stream and adjacent meadows unless livestock are authorized in the special use pasture. Livestock are only to be permitted to graze every 3rd year for 3 weeks or as approved by authorized officer. (It's been about ten years since grazing has been authorized in the area due to resource concerns.) The most imminent threat to the currant creek habitat is continual cattle drift into the drainage. This results in the unauthorized grazing of riparian vegetation and BLM projects such as willow, aspen, and other woody species plantings. The area is important habitat (ACEC area) for Colorado...
thumbnail
The Wyoming Range Mule Deer herd is Wyoming's largest deer herd and one of the largest in North America. Much of the winter range and transitional habitat for these deer is degraded, decadent, or otherwise unsuitable to sustain or improve herd health. In a comprehensive shrub assessment performed by Teton Science School on important winter ranges near La Barge and Big Piney, many areas were identified as needing treatments to improve forage conditions. This project would entail treating important mule deer habitat by using a variety of methods over a large landscape over a 10 year period.
thumbnail
Strategies – Include developing a grazing strategy that is adaptable to meet WLCI’s habitat needs and those of the property owner. This plan will include a reporting component to inform WLCI on observed results for this project including reestablishment of native riparian vegetation, wetland improvements, amount of forage left for wildlife use on hay pasture, and camera use to demonstrate wildlife uses during winter. Water resources - Partners Fish & Wildlife Services and NRCS are initiating wetland water improvement projects on this private property. There is also a proposed project to deepen a reservoir to improve habitat for water fowl. The project, via the landowner will reestablishing riparian plant species...
thumbnail
Objectives: 1. To make in-stream structures that were placed into Muddy Creek for stream reclamation passable to fish while still maintain the purpose and function of the original structure. 2. To reconnect 50 miles of contiguous stream habitat for BLM sensitive fishes including the Colorado River cutthroat troat, bluehead sucker, flannelmouth sucker, and roundtail chub. Background: Muddy Creek is the only system in Wyoming where viable populations of BLM sensitive Colorado River cutthroat trout, bluehead sucker, flannelmouth sucker, and roundtail chub coexist. Bluehead sucker, flannelmouth sucker, and roundtail chub populations have declined by about 50% range-wide and although Muddy Creek has the largest population...
thumbnail
Climate change has the potential to affect ecosystems across the WLCI region. Future changes in seasonal temperatures, and the timing and amount of rain and snowfall, may result in significant ecosystem shifts that affect wildlife species. Information on the magnitude and rate of potential changes in climate are needed for understanding and developing responses to the potential future impacts of these changes. For example, Wyoming land managers require future climate information to inform the development of adaptive management plans for the species and ecosystems they manage. The goal of this project is to develop datasets of potential future climate and vegetation changes for southwestern Wyoming that can help...
thumbnail
The strategy of low stress livestock handling has been documented to increase stubble heights along greenlines. Intuitively one could assume that since there is a significant increase in stubble height, then that fact alone would make for 'enhanced' late brood rearing habitat for the Greater Sage Grouse. In addition to an increase in stubble heights this low stress strategy increased utilization of uplands. In this case, on the surface, it would appear that the low stress strategy 'decreased' the quality of nesting and early brood rearing habitat. On the surface, it appears the strategy of low stress livestock handling has both pros and cons that need to be addressed on a more relevant management scale. The...
thumbnail
Project Synopsis: this project would fund the labor for mechanical, biological, and chemical applications in an effort to gain control of Perennial pepperweed, Russian knapweed, whitetop, Marsh sowthistle, and saltcedar. The watershed drains into the North Platte River which currently does not have perennial pepperweed. This area has crucial winter range for deer and elk, and yearlong range for antelope. There are sage grouse wintering areas and brood-rearing habitat, as well as numerous leks, and mountain plover. There are perennial streams with several species of willow. There have been efforts to improve Sage Creek proper, which was listed on the 303d list of impaired streams due to habitat degradation, and...
thumbnail
The private landowner and the FWS Partners for Fish & Wildlife Program propose to enhance approximately 72.3 acres of wetland through the construction and repair of dikes and water control structures on flood-irrigated land. Projects in the currently irrigated meadows comprise 14.3 acres of the 72.3 acres, which will be completed in the first phase of the project. Irrigation infrastructure will be enhanced to aid in spreading and backing flood-irrigation water on 14.3 acres of land within the approximately 575 acre complex of irrigated wet meadows. More specifically, 7 dikes and 8 water control structures will enhance the landowner’s ability to irrigate the land, while increasing open water in the wetlands. Incremental...


map background search result map search result map Application of Comprehensive Assessment to Support Decisionmaking and Conservation Actions Muddy Creek Sheet Piling Modification BLM Ferris Mountain Prescribed Burn Phase 1 Coal Creek Stabilization and Sediment Reduction Grey's River Ranger District Noxious Weed Control Pepperweed Partnership RSFO-Currant Creek Habitat Restoration Condict Ranch Habitat Improvements II Cottonwood Creek Bitter Creek Restoration 2013 Low Stress Livestock Handling New Fork River Infiltration of Trace Organics Sage-grouse Core Area Riparian Exclosure Project Sibert Habitat Lease Wyoming Range Mule Deer Habitat Project Pepperweed Partnership Sage-grouse Core Area Riparian Exclosure Project Grey's River Ranger District Noxious Weed Control New Fork River Infiltration of Trace Organics Wyoming Range Mule Deer Habitat Project Coal Creek Stabilization and Sediment Reduction Cottonwood Creek Low Stress Livestock Handling Sibert Habitat Lease Muddy Creek Sheet Piling Modification BLM Ferris Mountain Prescribed Burn Phase 1 Condict Ranch Habitat Improvements II RSFO-Currant Creek Habitat Restoration Bitter Creek Restoration 2013 Application of Comprehensive Assessment to Support Decisionmaking and Conservation Actions