Skip to main content
Advanced Search

Filters: Tags: Dredging (X) > partyWithName: Jimmy M Clark (X)

2 results (9ms)   

View Results as: JSON ATOM CSV
thumbnail
The Savannah Harbor Expansion Project (SHEP) began in January 2015 with the purpose of deepening the Savannah Harbor federal shipping channel to allow access to larger shipping vessels (U.S. Army Corps of Engineers, 2018a). There are various features and mitigation efforts to the SHEP, one of which is the installation of a dissolved-oxygen (DO) injection system at two locations along the Savannah River to maintain pre-SHEP DO levels in the harbor (U.S. Army Corps of Engineers, 2018b). The injection systems are installed upstream near Georgia Power Plant McIntosh in Effingham County, Georgia and downstream near Hutchinson Island, Chatham County, Georgia. Designed to maintain DO levels in the harbor as they were before...
The Savannah Harbor Expansion Project (SHEP) began in January 2015 with the purpose of deepening the Savannah Harbor federal shipping channel to allow access to larger shipping vessels (U.S. Army Corps of Engineers, 2018a). There are various features and mitigation efforts to the SHEP, one of which is the installation of a dissolved-oxygen (DO) injection system at two locations along the Savannah River to maintain pre-SHEP DO levels in the harbor (U.S. Army Corps of Engineers, 2018b). The injection systems are installed upstream near Georgia Power Plant McIntosh in Effingham County, Georgia, and downstream near Hutchinson Island, Chatham County, Georgia. Designed to maintain DO levels in the harbor as they were...


    map background search result map search result map Autonomous Underwater Vehicle Water-Quality Measurements in Savannah River, Savannah, Georgia, 2018-2019 Water-Quality Measurements in Savannah River, Savannah, Georgia, 2020 Autonomous Underwater Vehicle Water-Quality Measurements in Savannah River, Savannah, Georgia, 2018-2019 Water-Quality Measurements in Savannah River, Savannah, Georgia, 2020