Filters: Tags: Sediment Contamination (X) > Date Range: {"choice":"year"} (X)
1 result (34ms)
Filters
Date Types (for Date Range)
Categories Tag Types Tag Schemes |
Note: This data release is currently being revised and is temporarily unavailable. Two types of passive samplers for polychlorinated biphenyl (PCB) analysis were deployed in the Clinton River Area of Concern in 2019: semipermeable membrane devices for water and in-stream sediment samplers. Samplers were deployed in July 2019 and retrieved in August 2019. Additionally, bank sediment samples for PCB analysis were collected by the U.S. Geological Survey (USGS) in August 2019 and catch basin bottom material samples for PCB analysis were collected by LimnoTech in November 2019 under contract with the U.S. Army Corps of Engineers. These data are a part of a larger study and associated USGS report (https://doi.org/TBD).
Categories: Data,
Data Release - Under Revision;
Tags: Clinton River,
Environmental Health,
Hydrology,
Lake St. Clair,
Macomb County,
|
|