The prolonged history of industrialization, flood control, and hydropower production has led to the construction of 80,000 dams across the U.S. generating significant hydrologic, ecological, and social adjustments. With the increased ecological attention on re-establishing riverine connectivity, dam removal is becoming an important part of large-scale river restoration nationally, especially in New England, due to its early European settlement and history of waterpower-based industry. To capture the broader dimensions of dam removal, we constructed a GIS database of all inventoried dams in New England irrespective of size and reservoir volume to document the magnitude of fragmentation. We compared the characteristics...
Categories: Publication; Types: Citation
thumbnail
Abstract Dams have been a fundamental part of the U.S. national agenda over the past two hundred years. Recently, however, dam removal has emerged as a strategy for addressing aging, obsolete infrastructure and more than 1,100 dams have been removed since the 1970s. However, only 130 of these removals had any ecological or geomorphic assessments, and fewer than half of those included before- and after-removal (BAR) studies. In addition, this growing, but limited collection of dam-removal studies is limited to distinct landscape settings. We conducted a meta-analysis to compare the landscape context of existing and removed dams and assessed the biophysical responses to dam removal for 63 BAR studies. The highest...
Categories: Publication; Types: Citation
thumbnail
Abstract Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals--particularly large dams--and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal...
Categories: Publication; Types: Citation
thumbnail
Forty years ago, the demolition of large dams was mostly fiction, notably plotted in Edward Abbey's novel The Monkey Wrench Gang. Its 1975 publication roughly coincided with the end of large-dam construction in the United States. Since then, dams have been taken down in increasing numbers as they have filled with sediment, become unsafe or inefficient, or otherwise outlived their usefulness ( 1) (see the figure, panel A). Last year's removals of the 64-m-high Glines Canyon Dam and the 32-m-high Elwha Dam in northwestern Washington State were among the largest yet, releasing over 10 million cubic meters of stored sediment. Published studies conducted in conjunction with about 100 U.S. dam removals and at least 26...
Categories: Publication; Types: Citation
thumbnail
Understanding landscape responses to sediment supply changes constitutes a fundamental part of many problems in geomorphology, but opportunities to study such processes at field scales are rare. The phased removal of two large dams on the Elwha River, Washington, exposed 21 ± 3 million m 3, or ~ 30 million tonnes (t), of sediment that had been deposited in the two former reservoirs, allowing a comprehensive investigation of watershed and coastal responses to a substantial increase in sediment supply. Here we provide a source-to-sink sediment budget of this sediment release during the first two years of the project (September 2011-September 2013) and synthesize the geomorphic changes that occurred to downstream fluvial...
Categories: Publication; Types: Citation
thumbnail
Dam removals with unmanaged sediment releases are good opportunities to learn about channel response to abruptly increased bed material supply. Understanding these events is important because they affect aquatic habitats and human uses of floodplains. A longstanding paradigm in geomorphology holds that response rates to landscape disturbance exponentially decay through time. However, a previous study of the Merrimack Village Dam (MVD) removal on the Souhegan River in New Hampshire, USA, showed that an exponential function poorly described the early geomorphic response. Erosion of impounded sediments there was two-phased. We had an opportunity to quantitatively test the two-phase response model proposed for MVD by...
Categories: Publication; Types: Citation
thumbnail
Recent decades have seen a marked increase in the number of dams removed in the United States. Investigations following a number of removals are beginning to inform how, and how fast, rivers and their ecosystems respond to released sediment. Though only a few tens of studies detail physical responses to removals, common findings have begun to emerge. They include: (1) Rivers are resilient and respond quickly to dam removals, especially when removals are sudden rather than prolonged. Rivers can swiftly evacuate large fractions of reservoir sediment (≥50% within one year), especially when sediment is coarse grained (sand and gravel). The channel downstream typically takes months to years--not decades--to achieve a...
Categories: Publication; Types: Citation
thumbnail
Aging infrastructure coupled with growing interest in river restoration has driven a dramatic increase in the practice of dam removal. With this increase, there has been a proliferation of studies that assess the physical and ecological responses of rivers to these removals. As more dams are considered for removal, scientific information from these dam‐removal studies will increasingly be called upon to inform decisions about whether, and how best, to bring down dams. This raises a critical question: what is the current state of dam‐removal science in the United States? To explore the status, trends, and characteristics of dam‐removal research in the U.S., we searched the scientific literature and extracted basic...
Categories: Publication; Types: Citation
thumbnail
A substantial increase in fluvial sediment supply relative to transport capacity causes complex, large-magnitude changes in river and floodplain morphology downstream. Although sedimentary and geomorphic responses to sediment pulses are a fundamental part of landscape evolution, few opportunities exist to quantify those processes over field scales.We investigated the downstream effects of sediment released during the largest dam removal in history, on the Elwha River, Washington, USA, by measuring changes in riverbed elevation and topography, bed sediment grain size, and channel planform as two dams were removed in stages over two years. As 10.5 million t (7.1 million m3) of sediment was released from two former...
Categories: Publication; Types: Citation
thumbnail
Analytical tools are needed in riverine science and management to bridge the gap between GIS and statistical packages that were not designed for the directional and dendritic structure of streams. We introduce linbin, an R package developed for the analysis of riverscapes at multiple scales. With this software, riverine data on aquatic habitat and species distribution can be scaled and plotted automatically with respect to their position in the stream network or-in the case of temporal data-their position in time. The linbin package aggregates data into bins of different sizes as specified by the user. We provide case studies illustrating the use of the software for (1) exploring patterns at different scales by...
Categories: Publication; Types: Citation
thumbnail
The removal of dams has recently increased over historical levels due to aging infrastructure, changing societal needs, and modern safety standards rendering some dams obsolete. Where possibilities for river restoration, or improved safety, exceed the benefits of retaining a dam, removal is more often being considered as a viable option. Yet, as this is a relatively new development in the history of river management, science is just beginning to guide our understanding of the physical and ecological implications of dam removal. Ultimately, the “lessons learned” from previous scientific studies on the outcomes dam removal could inform future scientific understanding of ecosystem outcomes, as well as aid in decision-making...
Categories: Publication; Types: Citation
thumbnail
Dam decommissioning is rapidly emerging as an important river restoration strategy in the United States. Hundreds of dams have been removed in the past few decades, including several large ones (>10-15 meters) impounding large sediment volumes (>106 cubic meters) in the past 3 years, notably Condit Dam and the Elwha River dams in Washington State. These removals and the associated studies provide for the first time an opportunity to evaluate the immediate and persistent consequences of these significant fluvial--and in some cases, coastal--perturbations. Understanding dam removal response not only improves understanding of landscape and ecosystem adjustment to profound sediment pulses but also provides important...
Categories: Publication; Types: Citation
thumbnail
Dam removal is becoming an increasingly important component of river restoration, with > 1100 dams having been removed nationwide over the past three decades. Despite this recent progression of removals, the lack of pre- to post-removal monitoring and assessment limits our understanding of the magnitude, rate, and sequence of geomorphic and/or ecological recovery to dam removal. Taking advantage of the November 2012 removal of an old (~ 190 year-old) 6-m high, run-of-river industrial dam on Amethyst Brook (26 km 2) in central Massachusetts, we identify the immediate eco-geomorphic responses to removal. To capture the geomorphic responses to dam removal, we collected baseline data at multiple scales, both upstream...
Categories: Publication; Types: Citation
thumbnail
Managers make decisions regarding if and how to remove dams in spite of uncertainty surrounding physical and ecological responses, and stakeholders often raise concerns about certain negative effects, regardless of whether these concerns are warranted at a particular site. We used a dam-removal science database supplemented with other information sources to explore seven frequently raised concerns, herein Common Management Concerns (CMCs). We investigate the occurrence of these concerns and the contributing biophysical controls. The CMCs addressed are the following: degree and rate of reservoir sediment erosion, excessive channel incision upstream of reservoirs, downstream sediment aggradation, elevated downstream...
Categories: Publication; Types: Citation