Skip to main content
Advanced Search

Filters: Tags: Brandon Road Lock and Dam (X) > partyWithName: U.S. Geological Survey (X) > partyWithName: Central Midwest Water Science Center (X)

8 results (37ms)   

View Results as: JSON ATOM CSV
thumbnail
Bathymetric survey data of the Brandon Road Dam spillway was collected on May 27 and May 28, 2015 by the US Geological Survey (USGS) using Trimble Real-Time Kinematic Global Positioning System (RTK-GPS) equipment. The base station was set up over a temporarily installed survey pin on both days. This pin was surveyed into an existing NGS benchmark (PID: BBCN12) within the Brandon Road Lock property. In wadeable sections, a GPS rover with 2.0 meter range pole and flat-foot was deployed. In sections unable to be waded, a 2.0 meter range pole was fix-mounted to a jon boat, and a boat-mounted Acoustic Doppler Current Profiler (ADCP) was used to collect the depth data. ADCP depth data were reviewed in the WinRiver II...
thumbnail
Water velocities and discharge were measured in the lock chamber and immediately downstream of Brandon Road Lock on the Des Plaines River at river mile 286 on December 9-10, 2014 using Teledyne RDI Rio Grande 600 and 1200 kHz acoustic Doppler current profilers (ADCP). The data were georeferenced with a differential GPS receiver with submeter accuracy. These ADCP measurements were collected in support of the US Army Corps of Engineers Great Lakes and Mississippi River Interbasin Study (GLMRIS). Velocity measurements were processed using the Velocity Mapping Toolbox (Parsons and others, 2013) to derive temporally- and spatially-averaged water velocity values. Discharge measurements were processed with the QRev discharge...
thumbnail
Two survey boats equipped with differential Global Positioning System (GPS) receivers and Turner Designs C3 submersible fluorometers were used to survey the spatial distribution of the Rhodamine WT dye in the Des Plaines River downstream of the Brandon Road Lock and Dam (BRLD) near Rockdale, Ilinois. Mapping of the dye plume commenced after the lock chamber at BRLD was dyed with 4 liters of Rhodamine WT dye during a routine filling procedure. Measurements of dye concentration downstream collected by these survey boats capture the leakage of dyed water from the lock, the pulse of dyed water exiting the lock during routine emptying of the lock, and the mixing of the dyed water downstream during a 17-minute flushing...
thumbnail
Flow discharges were measured in the Des Plaines River from approximately river mile 286 to river mile 284 on October 19–21, 2015 using Teledyne Rio Grande 1200 kHz acoustic Doppler current profilers (ADCP). The data were georeferenced with differential GPS receivers with submeter accuracy. These flow discharge measurements were collected in support of the US Army Corps of Engineers Great Lakes and Mississippi River Interbasin Study (GLMRIS), and were concurrent with a dye-tracing study. The discharge measurements included here were collected in the following locations: immediately upstream, across, and immediately downstream of the NRG Energy Joliet Power Station right descending bank intake (North Intake) immediately...
thumbnail
Five Turner Designs C3 submersible fluorometers were deployed in the Des Plaines River downstream of the Brandon Road Lock and Dam (BRLD) near Rockdale, IL to measure Rhodamine WT dye concentrations during a U.S. Geological Survey dye study conducted on October 20-21, 2015. The lock chamber at BRLD was dyed with 4 liters of Rhodamine WT dye during a routine filling procedure. Measurements of dye concentration downstream collected by these instruments capture the leakage of dyed water from the lock, the pulse of dyed water exiting the lock during routine emptying of the lock, and the mixing of the dyed water downstream during a 17-minute flushing operation of the lock. The fluorometers were installed on both sides...
thumbnail
Water velocities were measured in the Des Plaines River from approximately river mile 286 to river mile 284 on October 19–21, 2015 using Teledyne Rio Grande 1200 kHz acoustic Doppler current profilers (ADCP). The data were georeferenced with differential GPS receivers with submeter accuracy. These velocity data were collected in support of the US Army Corps of Engineers Great Lakes and Mississippi River Interbasin Study (GLMRIS), and were concurrent with a dye-tracing study. ADCP data were collected in the approach channel of the Brandon Road Lock and downstream in the main channel of the Des Plaines River to determine the spatial distribution of depth-averaged velocity in the river on October 19–21, 2015. The data...
thumbnail
A Turner Designs C3 submersible fluorometer was deployed in the Brandon Road Lock chamber (BRLD) near Rockdale, Illinois, to measure Rhodamine WT dye concentrations during a U.S. Geological Survey dye study conducted on October 20, 2015. The lock chamber at BRLD was dyed with 4 liters of Rhodamine WT dye during a routine filling procedure. Measurements of dye concentration profiles were collected at 15 stations in the lock chamber and capture the three-dimensional distribution of the dye in the chamber after filling, after the lock was emptied, and after a 17-minute flushing operation of the lock. A series of five taglines and rope and pulley systems were used to position the fluorometer at each station to avoid...
thumbnail
An Insitu Level Troll 500 was deployed in the Brandon Road Lock chamber (BRLD) near Rockdale, Illinois between 12:09 Central Daylight Time (CDT) on October 19, 2015 and 14:57 CDT October 21, 2015 to monitor water-surface elevation in the lock chamber during a U.S. Geological Survey dye study conducted on October 20, 2015. The duration of the deployment included a day prior to and a day following the dye study to capture the lock operations leading up to and following the dye study. The instrument was deployed within conduit placed inside the ladder well near the 500-foot station on the right wall of the lock chamber (when looking downstream). At the time of deployment, the Level Troll was calibrated to the water...


    map background search result map search result map Acoustic Doppler current profiler velocity data collected in the approach channel of Brandon Road Lock and Dam in 2015 Rhodamine WT dye concentration profiles measured at fixed stations in the Brandon Road Lock chamber near Rockdale, Illinois (October 20, 2015) Rhodamine WT dye concentrations measured at fixed locations in the Des Plaines River near Brandon Road Lock and Dam near Rockdale, Illinois (October 20-21, 2015) Spatial distribution of Rhodamine WT dye concentration measured in the Des Plaines River near Brandon Road Lock and Dam near Rockdale, Illinois (October 20-21, 2015) Water surface elevation in the Brandon Road Lock chamber near Rockdale, Illinois (October 19-21, 2015) Bathymetric survey of the Brandon Road Dam Spillway, Joliet, Illinois Miscellaneous flow discharge measurements collected downstream of Brandon Road Lock and Dam Acoustic Doppler current profiler velocity and discharge measurements collected in and near the lock chamber of Brandon Road Lock and Dam, Joliet, Illinois, USA in December 2014 Rhodamine WT dye concentration profiles measured at fixed stations in the Brandon Road Lock chamber near Rockdale, Illinois (October 20, 2015) Water surface elevation in the Brandon Road Lock chamber near Rockdale, Illinois (October 19-21, 2015) Rhodamine WT dye concentrations measured at fixed locations in the Des Plaines River near Brandon Road Lock and Dam near Rockdale, Illinois (October 20-21, 2015) Acoustic Doppler current profiler velocity and discharge measurements collected in and near the lock chamber of Brandon Road Lock and Dam, Joliet, Illinois, USA in December 2014 Bathymetric survey of the Brandon Road Dam Spillway, Joliet, Illinois Acoustic Doppler current profiler velocity data collected in the approach channel of Brandon Road Lock and Dam in 2015 Miscellaneous flow discharge measurements collected downstream of Brandon Road Lock and Dam Spatial distribution of Rhodamine WT dye concentration measured in the Des Plaines River near Brandon Road Lock and Dam near Rockdale, Illinois (October 20-21, 2015)