Skip to main content
Advanced Search

Filters: Tags: Diversion (X) > Categories: Project (X)

1 result (6ms)   

View Results as: JSON ATOM CSV
thumbnail
This is a multi-year project to repair a diversion structure which is preventing a head-cut from continuing upstream. Objectives: 1) Reduce or halt erosion occurring at the headcut. 2) Halt the headcut progression which may infringe on and destabilize upstream railroad, highway, interstate, and mine PMT. 3) Halt the headcut progression into the upstream channel morphology and riparian regime. Strategies: • Detailed runoff and flow analysis to the headcut location for the associated 830 square mile drainage area. • Selection of the acceptable design event/peak design flow for the structure. • Determination of all permitting requirements, timeframes, and responsibilities. • Evaluation of the native material stability...


    map background search result map search result map Bitter Creek Restoration 2013 Bitter Creek Restoration 2013