Filters: Tags: Forest Service Land (X)
2 results (40ms)
Filters
Date Range
Extensions Types Contacts Categories |
This theme shows the Key Watersheds that are located on BLM lands and adjacent Forest Service Lands, as identified during the Forest Ecosystem Management Assessment effort (Northwest Forest Plan - Record of Decision 1994). The initial mapping done in 1994 was a very generalized representation and was done prior to the development of the interagency standard 5th and 6th field watershed boundaries. The line work has been made coincident with the 5th and 6th field watershed lines where the Key Watershed Boundaries clearly intended to use a watershed as the boundary. District personnel have reviewed these edits to conform to the 5th and 6th field boundaries and have incorporated other edits to follow operationally identifiable...
Categories: Data;
Types: Downloadable,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
Shapefile;
Tags: Conservation Priority Area,
Effects of changes in hydrologic regimes on anadromous fish,
Effects of hydrologic regime shifts on rivers, streams, and riparian corridors,
Forest Service Land,
Key Watersheds,
The Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) characterizes the ecological condition of watersheds and aquatic ecosystems to answer the core question: “Are the Northwest Forest Plan (NWFP) and the BLM Western Oregon Resource Management Plans maintaining and restoring the conditions of aquatic and riparian ecosystems on federal lands in the Forest Plan area?” AREMP determines the status and trend of inchannel and upslope-riparian watershed condition for sixth-field watersheds (HUC12) within the NWFP area. Upslope and riparian condition are based on mapped data (e.g. road density, vegetation) for all watersheds with ≥5% federal ownership. Inchannel condition is based on stream data (e.g. substrate,...
|
|