Skip to main content
Advanced Search

Filters: Tags: Mancos Shale (X) > Extensions: Citation (X)

5 results (30ms)   

View Results as: JSON ATOM CSV
Stream discharge and geochemical data were collected at two sites along lower Ashley Creek, Utah, from 1999 to 2003, to assess the success of a site specific salinity and Se remediation project. The remediation project involved the replacement of a leaking sewage lagoon system that was interacting with Mancos Shale and increasing the dissolved salinity and Se load in Ashley Creek. Regression modeling successfully simulated the mean daily dissolved salinity and Se loads (R(2) values ranging from 0.82 to 0.97) at both the upstream (AC1) and downstream (AC2/AC2A) sites during the study period. Prior to lagoon closure, net gain in dissolved-salinity load exceeded 2177 metric tons/month and decreased after remediation...
Stream discharge and geochemical data were collected at two sites along lower Ashley Creek, Utah, from 1999 to 2003, to assess the success of a site specific salinity and Se remediation project. The remediation project involved the replacement of a leaking sewage lagoon system that was interacting with Mancos Shale and increasing the dissolved salinity and Se load in Ashley Creek. Regression modeling successfully simulated the mean daily dissolved salinity and Se loads (R(2) values ranging from 0.82 to 0.97) at both the upstream (AC1) and downstream (AC2/AC2A) sites during the study period. Prior to lagoon closure, net gain in dissolved-salinity load exceeded 2177 metric tons/month and decreased after remediation...
thumbnail
Stream discharge and geochemical data were collected at two sites along lower Ashley Creek, Utah, from 1999 to 2003, to assess the success of a site specific salinity and Se remediation project. The remediation project involved the replacement of a leaking sewage lagoon system that was interacting with Mancos Shale and increasing the dissolved salinity and Se load in Ashley Creek. Regression modeling successfully simulated the mean daily dissolved salinity and Se loads (R(2) values ranging from 0.82 to 0.97) at both the upstream (AC1) and downstream (AC2/AC2A) sites during the study period. Prior to lagoon closure, net gain in dissolved-salinity load exceeded 2177 metric tons/month and decreased after remediation...
Relative yields of water, sediment, and salt (as indexed by electrical conductivity) were determined using simulated rainfall plots on three soil landform units on Mancos shale in the Price River Basin, Utah. Final infiltration rates on residual shale derived soils were between 0.13 and 0.50 cm/hr. No runoff was generated on cracked soils derived from aeolian deposits. Suspended sediment concentrations and elehcal conductivities were 180 and 68 times greater, respectively, for a steep dissected Mancos shale upland than for a low relief shale pediment and recent alluvial surface. Riling accounted for approximately 80 percent of the sediment produced on the steep, dissected shale surface. Channel scow and soil creep...
This study emphasized a field investigation of salt release to overland flow from Mancos shale lands of the Price River Basin, Utah. Although a high degree of natural variation existed in the data, which precluded the separation of factors affecting diffuse salt loading that occurs during overland flow, a simplistic nonpoint source loading function developed on empirical concepts was fit to the data. This function was then used to calculate the average annual salt yield to the Price River by overland flow. It was found that even under severe conditions, the salt yields from Mancos shale lands due to overland flow is relatively minor, accounting for less than 1.5 percent of the average annual salt mass transported...


    map background search result map search result map Utilizing geochemical, hydrologic, and boron isotopic data to assess the success of a salinity and selenium remediation project, Upper Colorado River Basin, Utah Utilizing geochemical, hydrologic, and boron isotopic data to assess the success of a salinity and selenium remediation project, Upper Colorado River Basin, Utah