Skip to main content
Advanced Search

Filters: Tags: Post Point (X) > Categories: Data (X) > partyWithName: Joshua Logan (X)

1 result (8ms)   

View Results as: JSON ATOM CSV
thumbnail
This portion of the data release presents the locations of the temporary ground control points (GCPs) used for the structure-from-motion (SfM) processing of the imagery collected during an unmanned aerial system (UAS) survey of the intertidal zone at Post Point, Bellingham Bay, WA on 2019-06-06. Nineteen temporary ground control points (GCPs) were distributed throughout each survey area to establish survey control. The GCPs consisted of a combination of small square tarps with black-and-white cross patterns and "X" marks placed on the ground using temporary chalk. The GCP positions were measured using post-processed kinematic (PPK) GPS, using corrections from a GPS base station located approximately 5 kilometers...


    map background search result map search result map Ground control point locations for UAS survey of the intertidal zone at Post Point, Bellingham Bay, WA, 2019-06-06 Ground control point locations for UAS survey of the intertidal zone at Post Point, Bellingham Bay, WA, 2019-06-06