Filters: Tags: SR530 (X)
1 result (7ms)
Filters
Date Range
Types Contacts
Tag Types Tag Schemes |
Digital elevation models of the SR530 Landslide, created using structure from motion photogrammetry. These surveys were performed at irregular intervals between July 1, 2014 and July 7, 2015. Due to the photogrammetric methods used to collect these surveys, there may be substantial artifacts near the edges of the surveys, in areas of vegetation, or over extents of bare water, and should be used with caution in these areas. Details of the collection and processing of these data are provides in the overview metadata file.
|
|