Reliable peak-streamflow information is critical for proper design of stream-related infrastructure, such as bridges, and StreamStats provides a user-friendly interface to estimate peak flows (https://streamstats.usgs .gov/ss/). StreamStats develops these peak-flow estimates using basin characteristics for the entire contributing area to a user-selected point; however, infrastructure planners often need to estimate flows for an area downstream from a known control such as a reservoir release or a weir. This dataset was compiled in cooperation with the South Carolina Department of Transportation (SCDOT) to provide a Geographic Information System (GIS) layer of filtered regulation points from the U.S. Army Corps Engineers...
Categories: Data;
Types: Downloadable,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
Shapefile;
Tags: Georgia,
North Carolina,
Region 1,
Region 2,
Region 3,
In 2004, about 90 migrating elk drowned after attempting to cross thin ice on the Mores Creek arm of Lucky Peak Lake upstream of the Highway 21 bridge. To better understand the depths over a range of reservoir pool elevations in the Mores Creek Arm, the U.S. Geological Survey, in cooperation with the Lucky Peak Power Plant Project, conducted high-resolution multibeam echosounder (MBES) bathymetric surveys on the Mores Creek arm on Lucky Peak Lake. The MBES data will assist reservoir managers and wildlife biologists with regulating reservoir water surface elevations (WSE) to support successful big game migration across Mores Creek on Lucky Peak Lake. Data collection provided nearly 100 percent coverage of bed elevations...
Categories: Data;
Types: Downloadable,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
OGC WMS Service,
Shapefile;
Tags: Boise,
GPS measurement,
Hypack,
Hysweep,
ID,
Reliable peak-streamflow information is critical for proper design of stream-related infrastructure, such as bridges, and StreamStats provides a user-friendly interface to estimate peak flows (https://streamstats.usgs.gov/ss/). StreamStats develops these peak-flow estimates using basin characteristics for the entire contributing area to a user-selected point; however, infrastructure planners often need to estimate flows for an area downstream from a known control such as a reservoir release or a weir. This dataset was compiled in cooperation with the South Carolina Department of Transportation (SCDOT) to provide a Geographic Information Systems layer of filtered regulation points from the National Inventory of Dams...
Categories: Data;
Types: Downloadable,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
Shapefile;
Tags: Georgia,
North Carolina,
Region 1,
Region 2,
Region 3,
In 2016, the U.S. Army Corps of Engineers (USACE) started collecting high-resolution multibeam echosounder (MBES) data on Lake Koocanusa. The survey originated near the International Boundary (River Mile (RM) 271.0) and extended down the reservoir, hereinafter referred to as downstream, about 1.4 miles downstream of the Montana 37 Highway Bridge near Boulder Creek (about RM 253). USACE continued the survey in 2017, completing a reach that extended from about RM 253 downstream to near Tweed Creek (RM 244.5). In 2018, the U.S. Geological Survey (USGS) Idaho Water Science Center completed the remaining portion of the reservoir from RM 244.5 downstream to Libby Dam (RM 219.9). The MBES data collected in 2016 and 2017...
Categories: Data;
Types: Downloadable,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
OGC WMS Service,
Shapefile;
Tags: GPS measurement,
Hypack,
Hysweep,
Kootenai,
Kootenai-Pend Oreille-Spokane,
In 2004, about 90 migrating elk drowned after attempting to cross thin ice on the Mores Creek arm of Lucky Peak Lake upstream of the Highway 21 bridge. To better understand the depths over a range of reservoir pool elevations in the Mores Creek Arm, the U.S. Geological Survey, in cooperation with the Lucky Peak Power Plant Project, conducted high-resolution multibeam echosounder (MBES) bathymetric surveys on the Mores Creek arm on Lucky Peak Lake. The MBES data will assist reservoir managers and wildlife biologists with regulating reservoir water surface elevations (WSE) to support successful big game migration across Mores Creek on Lucky Peak Lake. Data collection provided nearly 100 percent coverage of bed elevations...
Categories: Data;
Types: Downloadable,
GeoTIFF,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
OGC WMS Service,
Raster;
Tags: Boise,
GPS measurement,
Hypack,
Hysweep,
ID,
This dataset provides cost estimates for 668 dam removal projects occurring in the United States. Cost estimates were obtained by searching the internet for sources of information that mention the cost of dam removal projects listed in the USGS Dam Removal Information Portal. When cost data were not available for a dam removal but contact information was, then personal communications were used to acquire additional cost information. The accuracy of estimates is not known but we assume that most estimates represent close to the total cost or the minimum financial cost, with overestimates being rare. Total cost information could include component costs related to project planning, dam deconstruction cost, and several...
Categories: Data,
Data Release - In Progress;
Tags: United States,
dam sites,
ecosystem restoration,
environment,
inlandWaters,
In 2016, the U.S. Army Corps of Engineers (USACE) started collecting high-resolution multibeam echosounder (MBES) data on Lake Koocanusa. The survey originated near the International Boundary (River Mile (RM) 271.0) and extended down the reservoir, hereinafter referred to as downstream, about 1.4 miles downstream of the Montana 37 Highway Bridge near Boulder Creek (about RM 253). USACE continued the survey in 2017, completing a reach that extended from about RM 253 downstream to near Tweed Creek (RM 244.5). In 2018, the U.S. Geological Survey (USGS) Idaho Water Science Center completed the remaining portion of the reservoir from RM 244.5 downstream to Libby Dam (RM 219.9). The MBES data collected in 2016 and 2017...
Types: Map Service,
OGC WFS Layer,
OGC WMS Layer,
OGC WMS Service;
Tags: GPS measurement,
Hypack,
Hysweep,
Kootenai,
Kootenai-Pend Oreille-Spokane,
In 2016, the U.S. Army Corps of Engineers (USACE) started collecting high-resolution multibeam echosounder (MBES) data on Lake Koocanusa. The survey originated near the International Boundary (River Mile (RM) 271.0) and extended down the reservoir, hereinafter referred to as downstream, about 1.4 miles downstream of the Montana 37 Highway Bridge near Boulder Creek (about RM 253). USACE continued the survey in 2017, completing a reach that extended from about RM 253 downstream to near Tweed Creek (RM 244.5). In 2018, the U.S. Geological Survey (USGS) Idaho Water Science Center completed the remaining portion of the reservoir from RM 244.5 downstream to Libby Dam (RM 219.9). The MBES data collected in 2016 and 2017...
Categories: Data;
Types: Downloadable,
GeoTIFF,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
OGC WMS Service,
Raster;
Tags: GPS measurement,
Hypack,
Hysweep,
Kootenai,
Kootenai-Pend Oreille-Spokane,
In 2004, about 90 migrating elk drowned after attempting to cross thin ice on the Mores Creek arm of Lucky Peak Lake upstream of the Highway 21 bridge. To better understand the depths over a range of reservoir pool elevations in the Mores Creek Arm, the U.S. Geological Survey, in cooperation with the Lucky Peak Power Plant Project, conducted high-resolution multibeam echosounder (MBES) bathymetric surveys on the Mores Creek arm on Lucky Peak Lake. The MBES data will assist reservoir managers and wildlife biologists with regulating reservoir water surface elevations (WSE) to support successful big game migration across Mores Creek on Lucky Peak Lake. Data collection provided nearly 100 percent coverage of bed elevations...
Types: Map Service,
OGC WFS Layer,
OGC WMS Layer,
OGC WMS Service;
Tags: Boise,
GPS measurement,
Geomorphology,
Hydrology,
Hypack,
Reliable peak-streamflow information is critical for proper design of stream-related infrastructure, such as bridges, and StreamStats is a Web-based Geographic Information Systems (GIS) application that provides a user-friendly interface to estimate peak flows (https://streamstats.usgs.gov/ss/). StreamStats develops these peak-flow estimates using basin characteristics for the entire contributing area to a user-selected point; however, infrastructure planners often need to estimate flows for an area downstream from a known control such as a reservoir release or a weir. This dataset was compiled in cooperation with the South Carolina Department of Transportation (SCDOT) to provide a GIS layer of filtered regulation...
In 2004, about 90 migrating elk drowned after attempting to cross thin ice on the Mores Creek arm of Lucky Peak Lake upstream of the Highway 21 bridge. To better understand the depths over a range of reservoir pool elevations in the Mores Creek Arm, the U.S. Geological Survey, in cooperation with the Lucky Peak Power Plant Project, conducted high-resolution multibeam echosounder (MBES) bathymetric surveys on the Mores Creek arm on Lucky Peak Lake. The MBES data will assist reservoir managers and wildlife biologists with regulating reservoir water surface elevations (WSE) to support successful big game migration across Mores Creek on Lucky Peak Lake. Data collection provided nearly 100 percent coverage of bed elevations...
Categories: Data;
Types: Downloadable,
GeoTIFF,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
OGC WMS Service,
Raster;
Tags: Boise,
GPS measurement,
Hypack,
Hysweep,
ID,
In 2016, the U.S. Army Corps of Engineers (USACE) started collecting high-resolution multibeam echosounder (MBES) data on Lake Koocanusa. The survey originated near the International Boundary (River Mile (RM) 271.0) and extended down the reservoir, hereinafter referred to as downstream, about 1.4 miles downstream of the Montana 37 Highway Bridge near Boulder Creek (about RM 253). USACE continued the survey in 2017, completing a reach that extended from about RM 253 downstream to near Tweed Creek (RM 244.5). In 2018, the U.S. Geological Survey (USGS) Idaho Water Science Center completed the remaining portion of the reservoir from RM 244.5 downstream to Libby Dam (RM 219.9). The MBES data collected in 2016 and 2017...
|
|