Remarks: Gas producing intervals reported are: 2762-2770 m, 2773-1780 m, 2783-2794 m, 2835-2845 m, and 2866-2872 m all in the Elko Fm. Drill stem test at 2864-2865 m flowed gas and recovered 170 m of low pour-point oil. During testing the well flowed 93 MCF of gas; it was considered capable of commercial production but no pipeline facilities were available or anticipated. Oil was also recovered from Mississippian-Pennsylvanian rocks below 3049 m; Elevation: 1694 m; Permit Issue Date: 25 April 1979; Completion Date: 26 June 1980; Status: plugged and abandoned; Logs: Borehole Compensated Sonic, Cyberdip, Dipmeter, Compensated Neutron/Compensated Formation Density, Cement Bond, Dual Induction Laterolog, Fracture Identification; Samples: [...]