Skip to main content
Advanced Search

Filters: partyWithName: Boldt, J.A. (X)

Folders: ROOT > ScienceBase Catalog > Ohio-Kentucky-Indiana Water Science Center ( Show direct descendants )

6 results (17ms)   

Location

Folder
ROOT
_ScienceBase Catalog
__Ohio-Kentucky-Indiana Water Science Center
View Results as: JSON ATOM CSV
thumbnail
These data are high-resolution bathymetry (river bottom elevation) in XYZ format, generated from the February 14, 2017, topographic and hydrographic survey of the Des Plaines River in an area centered approximately 0.3 miles downstream of Brandon Road Lock and Dam at Joliet, Illinois. Hydrographic data were collected using a multibeam echo-sounder (MBES) with integrated inertial navigation solution (INS) mounted on a marine survey vessel. Data were collected as the vessel traversed the river along survey lines distributed throughout the area. Data collection software integrated and stored the depth data from the multibeam sonar and the horizontal and vertical position and attitude data of the vessel from the INS...
thumbnail
These data are bathymetry (river bottom elevation) in XYZ format (Easting, Northing, Elevation), generated from the September 17–18, 2020, survey of the Kentucky Dam tailwater from just downstream from Kentucky Dam to approximately 1,500 feet upstream from the I-24 bridge (about 1 mile total length). Bathymetric data were collected using an acoustic Doppler current profiler (ADCP) with an integrated global navigation satellite system (GNSS) smart antenna. The ADCP and GNSS antenna were mounted on a marine survey vessel, and data were collected as the survey vessel traversed the tailwater along planned survey lines. There was typically one reciprocal pair (two passes) of data collected per line. There was a total...
thumbnail
These data are high-resolution bathymetry (river bottom elevation) in XYZ format, generated from the February 13, 2017, topographic and hydrographic survey of the Des Plaines River in an area centered approximately 2.2 miles downstream of Brandon Road Lock and Dam at Joliet, Illinois. Hydrographic data were collected using a multibeam echo-sounder (MBES) with integrated inertial navigation solution (INS) mounted on a marine survey vessel. Data were collected as the vessel traversed the river along survey lines distributed throughout the area. Data collection software integrated and stored the depth data from the multibeam sonar and the horizontal and vertical position and attitude data of the vessel from the INS...
thumbnail
These data are measurements of sediment depth in the downstream approach channel of Brandon Rd Lock and Dam at Joliet, Illinois, on February 13-14, 2017. Data collection software recorded and stored the horizontal position of the vessel and the measured sediment depth. Data processing required computer software to extract position data from the target data files and to summarize and map the information.
thumbnail
These data are high-resolution bathymetry (river bottom elevation) in XYZ format, generated from the February 14, 2017, topographic and hydrographic survey of the Des Plaines River in an area centered approximately 250 feet upstream of Brandon Road Lock and Dam at Joliet, Illinois. Hydrographic data were collected using a multibeam echo-sounder (MBES) with integrated inertial navigation solution (INS) mounted on a marine survey vessel. Data were collected as the vessel traversed the river along survey lines distributed throughout the area. Data collection software integrated and stored the depth data from the multibeam sonar and the horizontal and vertical position and attitude data of the vessel from the INS in...
thumbnail
Water velocities were measured at discrete cross-sections along an approximately 1-mile reach of the Kentucky Dam tailwater on September 12 and 17-18, 2020, using a 1200 kHz acoustic Doppler current profiler (ADCP). The data were geo-referenced with an integrated global navigation satellite system (GNSS) smart antenna with submeter accuracy. The ADCP and GNSS antenna were mounted on a marine survey vessel, and data were collected as the survey vessel traversed the tailwater along planned survey lines. There was typically one reciprocal pair (two passes) of data collected per line. There was a total of 53 survey lines equally spaced 100 feet apart and oriented approximately perpendicular to the primary flow direction....


    map background search result map search result map Multibeam bathymetry—mooring area Multibeam bathymetry—approach channel Multibeam bathymetry—upstream pool Sediment depth—approach channel Bathymetry in the tailwater of Kentucky Dam (Tennessee River) near Gilbertsville, Kentucky, September 17–18, 2020 Velocity mapping in the tailwater of Kentucky Dam (Tennessee River) near Gilbertsville, Kentucky, September 12 and 17–18, 2020 Multibeam bathymetry—upstream pool Sediment depth—approach channel Multibeam bathymetry—approach channel Bathymetry in the tailwater of Kentucky Dam (Tennessee River) near Gilbertsville, Kentucky, September 17–18, 2020 Velocity mapping in the tailwater of Kentucky Dam (Tennessee River) near Gilbertsville, Kentucky, September 12 and 17–18, 2020 Multibeam bathymetry—mooring area