Filters: partyWithName: U.S. Geological Survey (X) > Types: Citation (X) > partyWithName: U.S. Geological Survey - ScienceBase (X) > partyWithName: Frank L. Engel (X)
4 results (10ms)
Filters
Date Range
Types Contacts Tag Types Tag Schemes |
Bathymetric survey data of the Brandon Road Dam spillway was collected on May 27 and May 28, 2015 by the US Geological Survey (USGS) using Trimble Real-Time Kinematic Global Positioning System (RTK-GPS) equipment. The base station was set up over a temporarily installed survey pin on both days. This pin was surveyed into an existing NGS benchmark (PID: BBCN12) within the Brandon Road Lock property. In wadeable sections, a GPS rover with 2.0 meter range pole and flat-foot was deployed. In sections unable to be waded, a 2.0 meter range pole was fix-mounted to a jon boat, and a boat-mounted Acoustic Doppler Current Profiler (ADCP) was used to collect the depth data. ADCP depth data were reviewed in the WinRiver II...
Water velocities were measured in the Calumet Harbor for 5 dates in 2015 and 2016 using Teledyne Rio Grande 600 kHz acoustic Doppler current profilers (ADCP). The data were georeferenced with differential Dlobal Positioning System (GPS) receivers with submeter accuracy. These velocity data were collected in cooperation with the US Army Corps of Engineers, Chicago District. ADCP data were collected on the following dates and for the following purposes: May 12, 2015: Water velocities in the Calumet Harbor and Calumet River. Unsteady discharges in the Calumet River mouth. September 9, 2015: Water velocities in the Calumet Harbor and Calumet River mouth. October 5, 2015: Water velocities in the Calumet Harbor and Calumet...
Types: Citation,
Map Service,
OGC WFS Layer,
OGC WMS Layer,
OGC WMS Service;
Tags: Calumet Harbor,
Calumet River,
Des Plaines River,
Illinois,
Lake Calumet,
Flow discharges were measured in the Des Plaines River from approximately river mile 286 to river mile 284 on October 19–21, 2015 using Teledyne Rio Grande 1200 kHz acoustic Doppler current profilers (ADCP). The data were georeferenced with differential GPS receivers with submeter accuracy. These flow discharge measurements were collected in support of the US Army Corps of Engineers Great Lakes and Mississippi River Interbasin Study (GLMRIS), and were concurrent with a dye-tracing study. The discharge measurements included here were collected in the following locations: immediately upstream, across, and immediately downstream of the NRG Energy Joliet Power Station right descending bank intake (North Intake) immediately...
Water velocities were measured in the Des Plaines River from approximately river mile 286 to river mile 284 on October 19–21, 2015 using Teledyne Rio Grande 1200 kHz acoustic Doppler current profilers (ADCP). The data were georeferenced with differential GPS receivers with submeter accuracy. These velocity data were collected in support of the US Army Corps of Engineers Great Lakes and Mississippi River Interbasin Study (GLMRIS), and were concurrent with a dye-tracing study. ADCP data were collected in the approach channel of the Brandon Road Lock and downstream in the main channel of the Des Plaines River to determine the spatial distribution of depth-averaged velocity in the river on October 19–21, 2015. The data...
|
|