Skip to main content
Advanced Search

Filters: Tags: {"type":"USGS Scientific Topic Keyword","name":"water resources"} (X) > Tags: {"type":"USGS Scientific Topic Keyword","name":"geomorphology"} (X) > Extensions: Shapefile (X)

6 results (17ms)   

View Results as: JSON ATOM CSV
thumbnail
As part of a collaborative study with the City of Raleigh, North Carolina, the U.S. Geological Survey is assessing streambank erosion potential in selected stream reaches throughout the Greater Raleigh metropolitan area. Rapid field measurement techniques were used to assess streambank stability at 124 stream segments between January and March 2022. Field data were collected using the Bank Erosion Hazard Index (BEHI) and Near Bank Stress (NBS) assessment methods (Rosgen, 2001; Rosgen and others, 2008) as well as the Rapid Geomorphic Assessment (RGA) method (Simon and others, 2007). This Data Release contains a dataset with all stream site information, field measurements, and streambank stability assessment results;...
thumbnail
Two tributary watersheds¬ Cottonwood Creek and Little Dry Creek¬ to the greater San Joaquin watershed, in California’s Central Valley were assessed for sediment and flow dynamics, between water years (Oct. 1 to Sept. 30) 2011 and 2019. The two systems deliver suspended sediment to the San Joaquin River below Friant Dam, California. Because these two creeks are directly down river of Friant Dam, they become the most upstream source of sediment to the San Joaquin River below Friant Dam. Thus, is it important to assess their contribution to the San Joaquin system. Flow from each creek watershed, along with the San Joaquin River, was compared to continuously measured water surface elevations to quantify flow direction...
thumbnail
This dataset consists of drainage basin boundaries for selected transboundary basins draining to the Gulf of Alaska in south-east Alaska. Basins were delineated to the basin outlet using a tidal datum of mean high water (MHW). The drainage basins are provided as polygons attributed with basin drainage area and as polylines attributed with the data source for each line segment, respectively.
thumbnail
On August 25, 2020, the U.S. Geological Survey conducted a bathymetry survey of a 550 meter long reach of the Black River near Great Bend, New York. The study reach began approximately 1,000 meters upstream from the State Route 26 bridge in Great Bend, New York. Depth data were collected primarily with a 1,200 kilohertz Teledyne RD Instruments RioPro acoustic Doppler current profiler (ADCP) with position data from differential global navigation satellite system (GNSS) Hemisphere V102 DGPS antenna (any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government). Water surface elevations were established using real-time kinematic (RTK) GNSS surveys;...
The Chicot aquifer system underlies an area of approximately 9,500 mi2 in southwestern Louisiana and is located within the Gulf Coastal Plain physiographic province. The region includes all or parts of 15 parishes -- Vernon, Rapides, Evangeline, Allen, Beauregard, Calcasieu, Jefferson Davis, Acadia, St. Landry, Lafayette, St. Martin, Cameron, Iberia, Vermilion, and St. Mary. The Chicot aquifer system is a major source of groundwater for southwestern Louisiana, accounts for approximately 48 percent of all groundwater use in the State, and provides freshwater for public supply, industry, agriculture, and aquaculture (Collier and Sargent, 2018). Withdrawals of groundwater have created water-level gradients favorable...
Categories: Data; Types: Downloadable, Map Service, OGC WFS Layer, OGC WMS Layer, Shapefile; Tags: Acadia Parish, Allen Parish, Beauregard Parish, CLAS, Calcasieu Parish, All tags...
thumbnail
In February 2017, the Grand River Dam Authority filed to relicense the Pensacola Hydroelectric Project with the Federal Energy Regulatory Commission. The predominant feature of the Pensacola Hydroelectric Project is Pensacola Dam, which impounds Grand Lake O’ the Cherokees (locally called Grand Lake) in northeastern Oklahoma. Identification of information gaps and assessment of project effects on stakeholders are central aspects of the Federal Energy Regulatory Commission relicensing process. Some upstream stakeholders have expressed concerns about the dynamics of sedimentation and flood flows in the transition zone between major rivers and Grand Lake O’ the Cherokees. To relicense the Pensacola Hydroelectric Project...


    map background search result map search result map Bathymetric surveys of the Neosho River, Spring River, and Elk River, northeastern Oklahoma and southwestern Missouri, 2016–17 Geospatial bathymetry dataset for the Black River near Great Bend, New York, 2020 Chicot Aquifer System Extent in Southwestern Louisiana, October 2020 Little Dry Creek and Cottonwood Creek Sediment Transport Data, 2012-2018, San Joaquin Watershed in the California Central Valley Datasets for Rapid Assessment of Streambank Erosion Potential for Selected Streams throughout the Greater Raleigh Area, North Carolina, 2022 Drainage basins for selected transboundary streams in south-east Alaska and Canada through 2022 Geospatial bathymetry dataset for the Black River near Great Bend, New York, 2020 Little Dry Creek and Cottonwood Creek Sediment Transport Data, 2012-2018, San Joaquin Watershed in the California Central Valley Datasets for Rapid Assessment of Streambank Erosion Potential for Selected Streams throughout the Greater Raleigh Area, North Carolina, 2022 Bathymetric surveys of the Neosho River, Spring River, and Elk River, northeastern Oklahoma and southwestern Missouri, 2016–17 Chicot Aquifer System Extent in Southwestern Louisiana, October 2020 Drainage basins for selected transboundary streams in south-east Alaska and Canada through 2022