Filters: Tags: automated sampling (X) > Extensions: Citation (X)
1 result (10ms)
Filters
Date Range
Types Contacts Categories |
The benefits of gradually removing a dam (through multiple notches) are to reduce the total project cost and reduce possible environmental effects by allowing the impounded sediment to slowly move downstream, and a stable stream and revegetated floodplain to form upstream. Notching, in this study of a dam on Brewster Creek, near St. Charles, Illinois, involves cutting a given height (in five 12–18 inch notches over approximately a 9 month period) across the length (or some portion of the length) of the dam. Brewster Creek is a tributary of the Fox River in northeastern, Illinois. Sediment, dissolved oxygen, and geomorphic response are being monitored before, during, and after a gradual (notching) removal of the...
Categories: Publication;
Types: Citation;
Tags: Analysis,
Automated sampling,
Calculation,
Costs,
Costs analysis,
|