Skip to main content
Advanced Search

Filters: Tags: multibeam sonar (X) > partyWithName: Ryan L Fosness (X)

11 results (24ms)   

View Results as: JSON ATOM CSV
thumbnail
In 2004, about 90 migrating elk drowned after attempting to cross thin ice on the Mores Creek arm of Lucky Peak Lake upstream of the Highway 21 bridge. To better understand the depths over a range of reservoir pool elevations in the Mores Creek Arm, the U.S. Geological Survey, in cooperation with the Lucky Peak Power Plant Project, conducted high-resolution multibeam echosounder (MBES) bathymetric surveys on the Mores Creek arm on Lucky Peak Lake. The MBES data will assist reservoir managers and wildlife biologists with regulating reservoir water surface elevations (WSE) to support successful big game migration across Mores Creek on Lucky Peak Lake. Data collection provided nearly 100 percent coverage of bed elevations...
thumbnail
In 2016, the U.S. Army Corps of Engineers (USACE) started collecting high-resolution multibeam echosounder (MBES) data on Lake Koocanusa. The survey originated near the International Boundary (River Mile (RM) 271.0) and extended down the reservoir, hereinafter referred to as downstream, about 1.4 miles downstream of the Montana 37 Highway Bridge near Boulder Creek (about RM 253). USACE continued the survey in 2017, completing a reach that extended from about RM 253 downstream to near Tweed Creek (RM 244.5). In 2018, the U.S. Geological Survey (USGS) Idaho Water Science Center completed the remaining portion of the reservoir from RM 244.5 downstream to Libby Dam (RM 219.9). The MBES data collected in 2016 and 2017...
thumbnail
In 2004, about 90 migrating elk drowned after attempting to cross thin ice on the Mores Creek arm of Lucky Peak Lake upstream of the Highway 21 bridge. To better understand the depths over a range of reservoir pool elevations in the Mores Creek Arm, the U.S. Geological Survey, in cooperation with the Lucky Peak Power Plant Project, conducted high-resolution multibeam echosounder (MBES) bathymetric surveys on the Mores Creek arm on Lucky Peak Lake. The MBES data will assist reservoir managers and wildlife biologists with regulating reservoir water surface elevations (WSE) to support successful big game migration across Mores Creek on Lucky Peak Lake. Data collection provided nearly 100 percent coverage of bed elevations...
thumbnail
In 2016, the U.S. Army Corps of Engineers (USACE) started collecting high-resolution multibeam echosounder (MBES) data on Lake Koocanusa. The survey originated near the International Boundary (River Mile (RM) 271.0) and extended down the reservoir, hereinafter referred to as downstream, about 1.4 miles downstream of the Montana 37 Highway Bridge near Boulder Creek (about RM 253). USACE continued the survey in 2017, completing a reach that extended from about RM 253 downstream to near Tweed Creek (RM 244.5). In 2018, the U.S. Geological Survey (USGS) Idaho Water Science Center completed the remaining portion of the reservoir from RM 244.5 downstream to Libby Dam (RM 219.9). The MBES data collected in 2016 and 2017...
thumbnail
In 2016, the U.S. Army Corps of Engineers (USACE) started collecting high-resolution multibeam echosounder (MBES) data on Lake Koocanusa. The survey originated near the International Boundary (River Mile (RM) 271.0) and extended down the reservoir, hereinafter referred to as downstream, about 1.4 miles downstream of the Montana 37 Highway Bridge near Boulder Creek (about RM 253). USACE continued the survey in 2017, completing a reach that extended from about RM 253 downstream to near Tweed Creek (RM 244.5). In 2018, the U.S. Geological Survey (USGS) Idaho Water Science Center completed the remaining portion of the reservoir from RM 244.5 downstream to Libby Dam (RM 219.9). The MBES data collected in 2016 and 2017...
thumbnail
In 2004, about 90 migrating elk drowned after attempting to cross thin ice on the Mores Creek arm of Lucky Peak Lake upstream of the Highway 21 bridge. To better understand the depths over a range of reservoir pool elevations in the Mores Creek Arm, the U.S. Geological Survey, in cooperation with the Lucky Peak Power Plant Project, conducted high-resolution multibeam echosounder (MBES) bathymetric surveys on the Mores Creek arm on Lucky Peak Lake. The MBES data will assist reservoir managers and wildlife biologists with regulating reservoir water surface elevations (WSE) to support successful big game migration across Mores Creek on Lucky Peak Lake. Data collection provided nearly 100 percent coverage of bed elevations...
thumbnail
Kootenai river hydraulic conditions were simulated using the iRIC FaSTMECH two-dimensional hydraulic flow model (Nelson, 2003). In addition to this study, FaSTMECH 2D flow models have been developed for numerous Kootenai River studies dating back to 2005. The methods used to develop, calibrate, and simulate FaSTMECH 2D flow models are described at length in multiple previous studies (Fosness and Dudunake, in press; Barton and others, 2005; Barton and others, 2007; Logan and others, 2011; McDonald and others, 2016; McDonald and Nelson, 2018; McDonald and Nelson, 2020). Model simulations were combined with white sturgeon telemetry data to explain fish positions with respect to selected depths and depth-averaged velocity.
Categories: Data; Types: Map Service, OGC WFS Layer, OGC WMS Layer, OGC WMS Service; Tags: Aquatic Biology, Bonners Ferry, Boundary, Ecology, Idaho, All tags...
thumbnail
In 2004, about 90 migrating elk drowned after attempting to cross thin ice on the Mores Creek arm of Lucky Peak Lake upstream of the Highway 21 bridge. To better understand the depths over a range of reservoir pool elevations in the Mores Creek Arm, the U.S. Geological Survey, in cooperation with the Lucky Peak Power Plant Project, conducted high-resolution multibeam echosounder (MBES) bathymetric surveys on the Mores Creek arm on Lucky Peak Lake. The MBES data will assist reservoir managers and wildlife biologists with regulating reservoir water surface elevations (WSE) to support successful big game migration across Mores Creek on Lucky Peak Lake. Data collection provided nearly 100 percent coverage of bed elevations...
thumbnail
In 2016, the U.S. Army Corps of Engineers (USACE) started collecting high-resolution multibeam echosounder (MBES) data on Lake Koocanusa. The survey originated near the International Boundary (River Mile (RM) 271.0) and extended down the reservoir, hereinafter referred to as downstream, about 1.4 miles downstream of the Montana 37 Highway Bridge near Boulder Creek (about RM 253). USACE continued the survey in 2017, completing a reach that extended from about RM 253 downstream to near Tweed Creek (RM 244.5). In 2018, the U.S. Geological Survey (USGS) Idaho Water Science Center completed the remaining portion of the reservoir from RM 244.5 downstream to Libby Dam (RM 219.9). The MBES data collected in 2016 and 2017...
thumbnail
The USGS, in cooperation with the U.S. Bureau of Reclamation, surveyed the bathymetry within an area of about 500 acres of American Falls Reservoir between River Miles 713 and 714 during the week of August 6-8, 2019. The bathymetric survey provided high resolution detail of a proposed treatment area for an aeration system that is being developed to support water quality during the American Falls spillway concrete repair project and possibly thereafter. The Water Quality Restoration Plan detailing this effort is an appendix of the of the Final Environmental Assessment (EA) in conjunction with the National Environmental Policy Act (NEPA) compliance process.
thumbnail
In October 2023, the U.S. Geological Survey Idaho Water Science Center (IDWSC), in cooperation with Lucky Peak Power Plant Project (LPPPP), completed bathymetric and topographic surveys at two dam intake structures using multibeam bathymetry and boat-mounted Light Detection and Ranging (LiDAR). Dam operators indicated a possibility that sediment aggradation was occurring near the intake structures that allow water to pass through the dam. The bathymetric and topographic data generally include complete coverage near the intake structures and banklines near Lucky Peak Dam.


    map background search result map search result map White sturgeon fine-scale habitat model archive, Kootenai River near Bonners Ferry, Idaho, 2017 American Falls Reservoir Bathymetry near River Mile 713 to 714, Power County, Idaho, 2019 U.S. Geological Survey and U.S. Army Corps of Engineers Bathymetric Survey of Lake Koocanusa, Lincoln County, Montana, 2016-2018 U.S. Geological Survey and U.S. Army Corps of Engineers Bathymetric Survey of Lake Koocanusa, Lincoln County, Montana, 2016—2018 Lake Koocanusa Maximum and Minimum Pool Elevation Contours, Lincoln County, Montana Lake Koocanusa Digital Elevation Model (DEM), Lincoln County, Montana Mores Creek Arm Bathymetric Survey, Lucky Peak Lake, Boise County, Idaho, May 11 - 13, 2021 Mores Creek Arm Bathymetric Survey - Depth Contours, Lucky Peak Lake, Boise County, Idaho, May 11 - 13, 2021 Mores Creek Arm Bathymetric Survey - Depth DEM, Lucky Peak Lake, Boise County, Idaho, May 11 - 13, 2021 Mores Creek Arm Bathymetric Survey - Elevation DEM, Lucky Peak Lake, Boise County, Idaho, May 11 - 13, 2021 Bathymetric and Topographic Surveys at Lucky Peak Lake Intake Structures, Boise County, Idaho, 2023 Bathymetric and Topographic Surveys at Lucky Peak Lake Intake Structures, Boise County, Idaho, 2023 U.S. Geological Survey and U.S. Army Corps of Engineers Bathymetric Survey of Lake Koocanusa, Lincoln County, Montana, 2016—2018 U.S. Geological Survey and U.S. Army Corps of Engineers Bathymetric Survey of Lake Koocanusa, Lincoln County, Montana, 2016-2018 Lake Koocanusa Digital Elevation Model (DEM), Lincoln County, Montana Lake Koocanusa Maximum and Minimum Pool Elevation Contours, Lincoln County, Montana